Solar Energy✓ Completed
Abacha Barracks, Abuja
Abuja
Client: General Victor
Completed: March 2024

The challenge
The 60kWh battery bank can involve substantial DC current, especially at lower battery voltages. Poor cable sizing or connections can cause voltage drop, overheating and energy losses.
The solution
Used correctly sized battery cables and busbars, install appropriate DC protection, keep cable runs as short as practical, and torque all high-current connections to the manufacturer's specification.
Outcome
Reliable backup power
Site gallery






System specifications
Scope of deliverables
- Reliable backup power
Need a similar installation?
Request an itemised proposal tailored to your property's load profile.
Request a similar quote